FAIL (the browser should render some flash content, not this).
FAIL (the browser should render some flash content, not this).
Structural Precast Systems

From: Parking Decks, Stadiums/Arenas, and Control Towers. If you would like to learn more please contact us.

Examples of work include:

Ohio State University Stadium Project Phase III  - Columbus, Ohio

Installation of the west side "C" deck and press box. Includes installation of beams, columns, risers, stairs, plank, and panels. Several hundreds of pieces of precast were erected to complete the installation of the structural components.

 

Port Columbus Control Tower - Columbus, Ohio

Traccon air traffic control tower at Port Columbus International Airport. The structure consists of a two-story, 26,100-square-foot administrative building at the base of what will amount to a 20-story tower. CFS handled all the precast erection on the tower and base building. The tower consists of 60,000 pound modules rising 150 feet, and the base building has architectural precast.

Precast Structural Systems (Additional Projects)






 About us   |   Crane Rental   |   Erection Service   |   Heavy Hauling   |   Special Services   |   Safety   |   Contact Us   |   Employee Area

 Copyright © 2006-2008 Capital City Group, Inc., All Rights Reserved Privacy policy. An Equal Opportunity Employer.